Building a safer, more connected Columbus🥳
Vision Zero ColumbusNow complete in Linden: Sidewalk gaps have been filled along Hiawatha Park Dr from Hudson St to Silver Dr/Velma Ave, and a shared-use path provides a connection to Historic Crew Stadium and connects to the path and sidewalks @columbusdps.bsky.social constructed along Hudson St in 2023-2024.