NEWS: Doncaster Dome (FaulknerBrowns, 1987-89) has reopened to the public following a 2 year, £15 million project to refurbish the pools, flumes, changing area, mechanical heating and water filter system. The Postmodern leisure centre was Grade II listed in 2023 after an application by C20 Society.