Yep. I understand that. But the answer is to alter and future proof the infrastructure. Not have different ‘consumables’! Bigger upfront cost, but cheaper in the long run. Or do what they did on the Overground: design the new stock to run on both hot-rail and overhead power.
Публикация
Обсуждение
0 прямых ответов
Ответов пока нет
Обсуждение ещё не началось.